Testing and commissioning

Proven Systems, Documented Before Start-Up

Hydrostatic, pneumatic and valve testing, dewatering, drying and commissioning support, carried out with calibrated equipment and closed out with complete test records.

  • Hydrotesting
  • Pneumatic testing
  • Commissioning support

Scope

What GTS Provides

Hydrostatic Testing

Strength and leak testing of pipelines, piping and vessels.

Pneumatic Testing

Pneumatic testing where hydrotesting is not practical.

Valve and Plug Testing

Testing of valves and plugs before and after installation.

Dewatering and Drying

Dewatering and drying of pipelines after hydrotest.

Nitrogen Purging

Purging and inerting of systems before start-up.

Loop Checks and Functional Tests

Loop checks and functional testing of supplied systems.

Qualifications

Credentials

Test packs and handover records for every system

Calibrated test equipment

Pressure testing carried out to approved methods and site permits

Questions

Common Questions

What testing does GTS carry out?

Hydrostatic, pneumatic, valve and plug testing, with calibrated equipment and recorded results.

Can testing be combined with cleaning and drying?

Yes. Testing, dewatering, drying and nitrogen purging can be planned as one sequence.

What is handed over at completion?

Complete test packs and records, to the operator’s specification.